TORONTO, June 18, 2018 /PRNewswire/ – Jaguar Mining Inc ("Jaguar" or the "Company") (TSX: JAG) today announced growth exploration drilling results from 13 underground holes at Turmalina Gold Mine ("Turmalina") targeting depth extensions to Orebody C. The Company also reported results from infill drilling and recent underground access development at Turmalina on Orebodies A and C and Pilar Gold Mine ("Pilar") on Orebodies BF and BFII.
Turmalina Exploration Highlights
- Turmalina Orebody C growth drilling, targeting down dip extensions, confirms gold mineralization 300m below current operations and open for expansion
- Significant high grade, wide and thick intercepts reflect down plunge extensions of the central high-grade payshoot at Orebody C currently being accessed for mining. Key intercepts include 7.77 g/t Au over 4.50m (ETW 4.25m), 9.22 g/t Au over 5.85m (ETW 5.11m) and 4.91 g/t Au over 15.10m (ETW (14.65m)
- Infill drill results on Orebodies A and C confirm wide high-grade intercepts. Orebody A key intercepts include 10.92 g/t Au over 17.29m (ETW 17.22m) and 17.23 g/t Au over 5.42m (ETW 5.35m)
- Orebody C key intercepts include 12.61 g/t Au x 4.16m (ETW 3.52m) and 3.36 g/t Au over 14.27m (ETW 14.27m) including 6.17 g/t Au over 5.32m (ETW 5.32m)
Pilar Exploration Highlights
- Infill drilling confirms wide, thicker and higher grade intercepts at BF and BFII Orebodies. Key intercepts include 22.8 g/t Au over 6.3m (ETW 5.5m), 12.2 g/t Au over 13m (ETW 12.7m), 6.5 g/t Au over 29.7m (ETW 28.8m) and 12.9 g/t Au over 8.4m (ETW 8.2m)
Definitions: ETW – estimated true width, g/t Au – grams per tonne gold, m – metres, Grade (g/t Au) x Thickness (m) = GM (gram – meters)
Rodney Lamond, President and CEO, Jaguar Mining commented: "We continue to make excellent progress accessing and defining higher grade, thicker portions of principle orebodies at both Turmalina and Pilar mining operations. The continued success of growth exploration initiatives, with many holes intercepting gold mineralization, particularly on Orebody C at Turmalina, support our view that we have a significant gold system. The addition of Orebody C to our mineral resources inventory, including shallow high-grade mineralization, provides Turmalina additional ore faces and operational flexibility going forward and gives us confidence in our ability to deliver on production expectations. At Pilar, the wide, high-grade mineralization now accessed through development further demonstrates and supports our strong belief that Pilar's increased production profile is achievable and sustainable. We continue to invest in maximizing the geological information that new drilling and development bring through our mine geological-structural mapping initiative and these observations will help drive our short and long-term planning."
Turmalina Key Highlights
Results from a 13 growth exploration drill holes targeting down dip extensions to Orebody C below level 3 confirm continuity of the structure to beyond 8 level some 300m below current operations.
Recent drill results show several very high grade, wide drill intercepts with grade x thickness values > 30 including 7.77 g/t Au over 4.50m (ETW 4.25m), 9.22 g/t Au over 5.85m (ETW 5.11m) and 4.91 g/t Au over 15.10m (ETW (14.65m). These intercepts reflect the down plunge extensions of the central high-grade payshoot currently being-accessed for mining on levels 3 and 4. Four drill intercepts with Grade x Thickness values > 10 GM are also reported.
Orebody A
Results from infill drilling and access development from the main ramp on Levels 11.3 and 11.4 confirmed the high grades and thickness profiles as predicted from the geological-resource models previously reported (Refer press release to February 26, 2018). Results from 11 infill holes are reported of which seven holes have intersections with grade x thickness of > 10 GM including two exceptional intercepts reporting 10.94 g/t Au over 17.29m (ETW 17.22m) and 17.23 g/t Au over 5.42m (ETW 5.35m).
Orebody C
Results from infill drilling and access development on levels 3 and 4 confirmed the high grades and thickness profiles as predicted from the geological-resource models and reported in the previous press-release (Refer press release to February 26, 2018). Results from 22 infill holes are reported of which 14 holes have intersections with a grade x thickness of > 10 GM including four intercepts with grade x thickness > 30 GM. The two best intercepts reported are 12.61 g/t Au x 4.16m (ETW 3.52m) and 3.36 g/t Au over 14.27m (ETW 14.27m) including 6.17 g/t Au over 5.32m (ETW 5.32m).
Importantly, this infill drilling and geological – structural mapping on Orebody C access development has allowed better definition and delineation of the orebody plunge which is now more to the SE (similar to that of Orebody A) and helped define payshoot parameters for the higher grades and thicknesses within the overall mineralized structure hosting this orebody. This information will inform mine design and planning to optimize the extraction of these high-grade areas.
Pilar Key Highlights
Results from infill drilling and underground development on level 10 has exposed wider and materially higher-grade mineralization in principal Orebodies BF and BFII.
Results from six infill holes targeting the principle orebodies on this level are reported. Of the 14 individual mineralized intercepts reported from these holes, four have grade x thickness intervals > 100 GM and a further nine have grade x thickness intervals > 50 GM.
Key results include 22.8 g/t Au over 6.3m (ETW 5.5m), 12.2g/t Au over 13m (ETW 12.7m), 6.5 g/t Au over 29.7m (ETW 28.8m) and 12.9 g/t Au over 8.4m (ETW 8.2m)
Pilar commenced a mine wide, geological-structural mapping programme aimed at detailed mapping of all available underground exposure at a scale of 1:100. Mapping of the BF and BFII Orebodies on level 10.2 has demonstrated the high grades exposed on this level are-related to the fold hinges and limbs of two superimposed (by faulting) anticlines, which define the BF and BFII Orebodies. The plunges of these anticlines have been verified by mapping and structural measurements that will aid in targeting further exploration of these important high-grade structures to depth. (Please refer to Figure 4).
As part of the previously reported growth exploration program at Pilar, drill-hole PPL443 was received reporting strongly mineralized intervals within the targeted down plunge extensions to the principal ore zones below 10 level. Key intercepts include were 2.7 g/t Au over 32.4m (ETW 18.2m) including 6.0 g/t Au over 3.1m (ETW 1.7m) and 8.1 g/t Au over 4.0m (ETW 2.1m) and 3.4 g/t Au over 24.7m (ETW 15.9m) including 13.4 g/t Au over 1.9m (ETW 1.2m) and 7.2 g/t Au over 4.6m (ETW 2.6m).
Jon Hill, Expert Advisor, Geology and Exploration, to the Jaguar Mining Management Committee commented: "We are pleased to see closer spaced drill-results and mapping validate the predicted resources inventory as the mining sequence progresses. It is even better when grade and contained metals estimations are exceeded as the orebodies defined by drilling are physically accessed for extraction. As we complete more detailed closer spaced drilling and development, and as mining progresses, drill results demonstrating increasing grade-thickness and ounce per vertical meter have become the norm at Pilar and Turmalina. The positive results reported today again demonstrate confidence in the predictive geological models in use that will allow longer-term life of mine scenario planning to be completed. Drill programs in 2018 remain focused on converting and upgrading the growing mineral resources inventory and upgrading mineral reserves while systematically exploring a growing portfolio of targets within the Company's strategic tenement portfolio."
Turmalina Gold Mine Drill Results and Intercepts
Table 1. Growth Exploration Drilling Results Orebody C
Turmalina Gold Mine |
||||||
Hole ID |
From |
To |
Down Hole |
Estimated True |
Gold Grade (g/t) |
GT |
FTS1480 |
172.9 |
177 |
4.10 |
3.62 |
5.50 |
19.91 |
FTS1481 |
178.2 |
184.3 |
6.10 |
5.61 |
2.37 |
13.30 |
FTS1482 |
174.3 |
180.15 |
5.85 |
5.11 |
9.22 |
47.11 |
FTS1483 |
193.05 |
194.05 |
1.00 |
0.80 |
4.47 |
3.58 |
FTS1484 |
182.15 |
185.25 |
3.10 |
2.37 |
1.47 |
3.48 |
FTS1485 |
206.45 |
209.3 |
2.85 |
2.49 |
3.97 |
9.89 |
FTS1486 |
185 |
200.1 |
15.10 |
14.65 |
4.91 |
71.93 |
FTS1487 |
217.85 |
219.95 |
2.10 |
1.95 |
6.62 |
12.91 |
FTS1488 |
181.4 |
188.03 |
6.63 |
6.46 |
1.96 |
12.66 |
192.3 |
199.3 |
7.00 |
6.82 |
5.51 |
37.58 |
|
FTS1550 |
201.65 |
202.9 |
1.25 |
0.90 |
1.10 |
0.99 |
FTS1551 |
149.05 |
150 |
0.95 |
0.89 |
1.01 |
0.90 |
FTS1556 |
206.7 |
209.4 |
2.70 |
2.45 |
5.11 |
12.52 |
FTS1557 |
187.75 |
192.25 |
4.50 |
4.25 |
7.77 |
33.00 |
FTS1552 |
No impact |
Table 2. Infill Drilling Results Orebody A – Turmalina
Please note assay results reported in the tabulation below were analyzed at Jaguar's Caeté Laboratory.
Turmalina Gold Mine |
||||||
Hole ID |
From |
To |
Down Hole |
Estimated True |
Gold Grade (g/t) |
GT |
FTS1580 |
103.20 |
120.49 |
17.29 |
17.22 |
10.94 |
188.39 |
FTS1581 |
72.24 |
77.46 |
5.22 |
5.20 |
2.71 |
14.09 |
FTS1582 |
61.26 |
63.59 |
2.33 |
2.31 |
4.02 |
9.29 |
FTS1583 |
51.55 |
55.84 |
4.29 |
4.83 |
5.54 |
26.76 |
FTS1584 |
37.67 |
39.53 |
1.86 |
1.84 |
2.76 |
5.08 |
55.13 |
60.55 |
5.42 |
5.35 |
17.23 |
92.18 |
|
FTS1585 |
67.01 |
68.32 |
1.31 |
1.30 |
2.14 |
2.78 |
FTS1586 |
81.95 |
85.97 |
4.02 |
3.94 |
8.90 |
35.07 |
FTS1593 |
56.75 |
60.97 |
4.22 |
3.03 |
3.12 |
9.45 |
FTS1594 |
44.66 |
48.06 |
3.40 |
3.03 |
2.53 |
7.67 |
FTS1595 |
41.68 |
43.74 |
2.06 |
2.00 |
5.14 |
10.28 |
FTS1596 |
43.05 |
47.10 |
4.05 |
3.90 |
7.30 |
28.47 |
Table 3. Infill Drilling Results Orebody C
Please note assay results reported in the tabulation below were analyzed at Jaguar's Caeté Laboratory.
Turmalina Gold Mine Infill Drill Results Orebody C |
||||||
Hole ID |
From |
To |
Down Hole |
Estimated True |
Gold Grade (g/t) |
GT |
FTS1499 |
26.27 |
28.29 |
2.02 |
1.71 |
3.49 |
5.97 |
FTS1501 |
38.17 |
40.95 |
2.78 |
1.17 |
2.61 |
3.05 |
FTS1502 |
60.22 |
62.39 |
2.17 |
2.07 |
2.10 |
4.35 |
FTS1509 |
28.77 |
29.52 |
0.75 |
0.55 |
3.27 |
1.80 |
FTS1515 |
123.52 |
127.68 |
4.16 |
3.52 |
12.61 |
44.39 |
FTS1516 |
126.15 |
128.36 |
2.21 |
1.93 |
7.04 |
13.59 |
FTS1517 |
64.67 |
70.35 |
5.68 |
4.22 |
5.42 |
22.87 |
73.48 |
74.48 |
1.00 |
0.74 |
2.96 |
2.19 |
|
FTS1518 |
50.13 |
51.13 |
1.00 |
0.80 |
4.63 |
3.70 |
66.56 |
80.83 |
14.27 |
14.27 |
3.36 |
48.00 |
|
Including |
70.11 |
75.43 |
5.32 |
5.32 |
6.17 |
32.80 |
FTS1519 |
72.08 |
85.70 |
13.62 |
11.55 |
3.47 |
40.08 |
FTS1532 |
161.02 |
162.92 |
1.90 |
1.74 |
1.50 |
2.61 |
FTS1534 |
59.70 |
60.91 |
1.21 |
1.08 |
6.52 |
7.04 |
FTS1536 |
42.41 |
47.54 |
5.13 |
4.20 |
4.24 |
17.81 |
FTS1538 |
47.91 |
48.91 |
1.00 |
0.79 |
3.01 |
2.38 |
FTS1539 |
63.87 |
64.97 |
1.10 |
0.93 |
6.09 |
5.66 |
92.24 |
95.29 |
3.05 |
2.58 |
6.00 |
15.48 |
|
FTS1540 |
68.15 |
69.15 |
1.00 |
0.85 |
1.45 |
1.23 |
75.55 |
76.75 |
1.20 |
1.02 |
1.63 |
1.66 |
|
79.19 |
80.39 |
1.20 |
1.02 |
2.27 |
2.32 |
|
FTS1541 |
No intersection |
|||||
FTS1542 |
53.07 |
57.20 |
4.13 |
3.85 |
1.73 |
6.66 |
FTS1543 |
55.75 |
59.10 |
3.35 |
3.16 |
4.61 |
14.57 |
FTS1547 |
62.45 |
68.35 |
5.90 |
3.46 |
4.66 |
16.12 |
92.01 |
100.79 |
8.78 |
6.52 |
4.04 |
26.34 |
|
FTS1548 |
75.13 |
80.02 |
4.89 |
4.10 |
5.20 |
21.32 |
FTS1549 |
79.77 |
86.57 |
8.74 |
7.32 |
3.31 |
24.23 |
FTS1571 |
110.07 |
115.94 |
5.87 |
4.29 |
4.05 |
17.37 |
Pilar Drill Results and Intercepts
Table 4. Infill Drilling Results Level 10
Pilar Gold Mine Infill Drill Results Level 10 |
||||||
Hole ID |
From |
To |
Down Hole |
Estimated True |
Gold Grade (g/t) |
GT |
PPL484 |
41.5 |
65.8 |
24.3 |
20.8 |
3.1 |
65.4 |
PPL537 |
64.9 |
71.2 |
6.3 |
5.5 |
22.8 |
124.0 |
PPL409 |
44.9 |
58.6 |
13.7 |
13.0 |
5.2 |
67.1 |
PPL498 |
30.0 |
43.0 |
13.0 |
12.7 |
12.2 |
154.3 |
PPL455 |
51.0 |
66.8 |
15.8 |
15.0 |
5.3 |
79.9 |
PPL500 |
32.9 |
61.7 |
28.8 |
19.1 |
3.6 |
68.7 |
PPL479 |
72.3 |
81.6 |
9.3 |
3.4 |
7.2 |
24.8 |
PPL530 |
99.2 |
108.0 |
8.9 |
8.6 |
7.0 |
60.2 |
PPL502A |
23.3 |
43.0 |
19.7 |
17.3 |
4.3 |
73.7 |
PPL495 |
26.1 |
34.4 |
8.4 |
8.2 |
12.9 |
106.2 |
PPL472 |
39.2 |
68.9 |
29.7 |
28.8 |
6.5 |
185.8 |
PPL536A |
14.6 |
26.0 |
11.4 |
10.2 |
8.6 |
88.1 |
PPL470A |
44.6 |
55.7 |
11.1 |
10.5 |
5.1 |
53.2 |
FSB604 |
1.1 |
15.0 |
13.9 |
13.5 |
6.1 |
82.5 |
Table 5. Growth Exploration Drilling Results Pilar
Pilar Gold Mine Growth Exploration Drill Results |
||||||
Hole ID |
From |
To |
Down Hole Interval (m) |
Estimated True |
Gold Grade (g/t) |
GT |
PPL443 |
490.6 |
523.0 |
32.4 |
18.2 |
2.7 |
48.6 |
Including |
3.1 |
1.7 |
6.0 |
10.4 |
||
535.0 |
540.0 |
5.0 |
3.1 |
2.4 |
7.4 |
|
541.0 |
556.0 |
15.0 |
7.9 |
3.6 |
28.7 |
|
Including |
4.0 |
2.1 |
8.1 |
17.0 |
||
558.0 |
561.0 |
3.0 |
2.2 |